January 1944 Tower Log Entries
306th Bomb Group--Thurleigh, England

Tower Logs were maintained in the Control Tower for every day of operations during the war. Valuable information regarding weather, general field conditions, and mission takeoff and landing details are included. The logs have been scanned one day at a time (see below). Click on a date below to download a pdf of the pages in the Tower Log for the date desired.

Be patient--some of these files are large and will take some time to download.
\
1 January 1944 2 January 1944 3 January 1944 4 January 1944 5 January 1944
6 January 1944 7 January 1944 8 January 1944 9 January 1944 10 January 1944
11 January 1944 12 January 1944 13 January 1944 14 January 1944 15 January 1944
16 January 1944 17 January 1944 18 January 1944 19 January 1944 20 January 1944
21January 1944 22 January 1944 23 January 1944 24 January 1944 25 January 1944
26 January 1944 27 January 1944 28 January 1944 29 January 1944 30 January 1944
31 January 1944